Drill Pipe Inspection Services

Straightening | Cleaning | Pull Testing | Refacing

nondestructive testing

Holly Pipe thoroughly inspects all tools, drill pipe, and other tubulars before shipping to deliver the highest quality products to drillers world wide. Our tools are precision manufactured and must meet API standards before shipment. Holly Pipe’s level II certified inspectors comply with ASNT procedures and standards, offering inspection services for drill pipe and other drilling tubulars. The latest procedures are preformed in accordance with RP7-G and DS-1 criteria, providing various levels of nondestructive testing (NDT) and certifying tools free of all defects. Holly Pipe conducts the following NDT inspection services for drill pipe, drilling tubulars and components:



EMI inspection

  • Magnetic Particle Inspection (MPI)
  • Electromagnetic Tube Inspection (EMI) (2 3/8" - 6 5/8")
  • Ultrasonic Testing
  • Connection Blacklighting
  • Liquid Penetrant Inspection


Drilling Tubulars Straightening

Straightening

Bent drilling tubulars are common in the drilling industry, and Holly Pipe is equipped to handle straightening of any drill pipe, heavy weight drill pipe or drill collar. Straightening is typically done during inspection to allow for possible machine shop work on connections. Extreme bends are addressed before inspection. Individual tubulars are placed in a hydraulic press to carefully and accurately correct the tubing while maintaining integrity.




Drill Pipe Cleaning

water blasting

Cleaning drill pipe and tubulars with air rattling or water blasting comes second after straightening to conduct a thorough inspection. Holly Pipe’s inspectors analyze the drill pipe to determine whether to clean with water or air to safely remove contaminants. After determining the condition of the pipe, the outside and inside of the pipe is cleaned as per customer request.










Drill String Pull Testing

pull testing

When you need to test the tensile capabilities of your drill string or tooling, Holly Pipe has the ability to test materials with 800,000 lbs of tension. It’s reassuring to know that the tools used will sustain at least 80% of the planned pulling load. Our pull tester executes the pulling load upon the pipe and is held for three seconds and released. Data from the load and time is recorded on a digital system, which in turn can be printed or filed electronically.

Drill Pipe Connection Refacing

Refacing

Sometimes drill pipe connections need reconditioning, and other times it only needs to be refaced. Holly Pipe takes the time to check connections and determine what is actually needed. Once the connections are inspected for cracks we start field dressing or refacing in order to make the pipe suitable for makeup and drilling.


For more information please contact us.

Return to top of page